Ask three builders the same question. Then write down what you agreed.

Most self-builders send a drawing and a phone call, and get back three numbers that cannot be compared because nobody was asked the same thing. This writes one document per trade: what to price, line by line, with what is not in that package named and pointed at the package that carries it.

many hands make light work

The expensive thing is not a high price. It is the job nobody thought was theirs.

How one enquiry gets written, from a real one on the build you can look round.

Step 1 of 5

Tell it the trade, and when you want prices back

A handful of answers. Which package, which part of it, the day you are sending it, the day you want prices by.

Tick what is in the envelope: the drawings, the programme, the ground report. The list prints on the enquiry, so a builder can check the envelope against it and ask before pricing round a gap.

The enquiry settings: which package, which part of it, which document, the day it is being sent, the day prices are wanted back, and who the copy is for.

Step 2 of 5

The schedule is already written

What comes out is a document that knows the trade it is going to: the schedule of what to price is already written out for that package, item by item, with the unit each one is measured in.

It is the same list your budget is built on, so when a price comes back it lands on the line it was asked for.

The pricing schedule inside the enquiry: numbered items with quantity, unit, rate and total columns.

Step 3 of 5

It says what is not in the package

Every enquiry carries the list of what is not in it, each line naming the package that carries it instead. Anything on it that a builder has priced anyway is money you gave away twice.

Anything on it that everybody assumed somebody else was doing is the gap that turns up on site in week nine, when the answer is expensive.

Section 4 of the enquiry: what is in this package, then a numbered table of what is not in it, each line naming the package that carries it instead.

Step 4 of 5

What you know about your own plot

The last part is yours and nobody else can write it: the lane is single track, the hours are a planning condition and not a preference, there is a field drain on a 1970s plan that nobody has dug for.

You write it once and it prints into every enquiry. A builder who is told that prices it. A builder who finds it in week three charges you for it.

The site information section written by the reader: working hours fixed by a planning condition, the neighbour who works nights, the single-track lane, the field drain.

Step 5 of 5

Send it, and keep what they were sent

Word documents you can edit before they go, or PDFs if you would rather send something fixed.

A copy of exactly what each builder was sent is kept against your record, so nine months later there is no argument about what they were asked.

The record of enquiries sent, grouped by stage of the build: the package, who it went to, the day it was issued, the day prices were wanted back, and the documents.

And then what you agreed

What goes wrong after the quotes are in is that nobody wrote down what was placed, what changed, what has been certified, and what is still being held back.

Step 1 of 3

The appointment or the order

A price is not an agreement. The appointment or order itself: blank to fill in by hand, or already filled in from what you have recorded, on your own letterhead.

The agreements door: a blank appointment to fill in by hand, or one already filled in from what has been recorded, with the fee schedule for that discipline attached.

Step 2 of 3

Every change, with the dates

Every build changes. Each change gets a number, a description in your own words, how it was priced, and the dates it was raised, priced and agreed.

That is the difference between a variation and an argument.

The instructions record: each numbered change, who it went to, what changed in plain words, how it was priced, and the dates.

Step 3 of 3

The money you are owed back

If you hold three per cent of every valuation, half of it comes back at completion and half of it a year later: on a build with a dozen trades that is thousands of pounds, owed to you, on twenty-four separate dates.

Nobody sends you a reminder. This is the list.

The retention record: every agreement on the build, on what basis retention is held, the date it falls due and the date it was released.

What you get out

The enquiry

A Word document on your letterhead, or a PDF, with the priced schedule for that trade in it.

A covering letter

Listing everything going with it, so nothing arrives unexplained.

And the record

Who you sent it to, when, and a copy of exactly what they were sent.